2019 new fashion flower design lace,high quality chemical lace for decoration
2019 new fashion flower design lace,high quality chemical lace for decoration
2019 new fashion flower design lace,high quality chemical lace for decoration
2019 new fashion flower design lace,high quality chemical lace for decoration

Review

Description

res

Production time

Normally 7-20 days depends on the quantity

Packing Method

Inner:pack in bundles and put in the polybags

Outer:standard carton

or as customer's requirement

Payment Term

30% desposit before production ,and the balance to be paid before the shipment.

We can accept T/T,  Paypal.Westen Union

Shipping mode( Delivery Terms)By Sea, By Air, By DHL/FedEx/UPS/TNT.
Sample lead time2 - 3 days if  available

 

 

 

Quality Control:

 

To ensure high quality of our products, we check every unit piece by piece based on a zero-defect inspection model. And all raw materials are inspected before they are put into production. Our QC team also makes double checks to an AQL of clients choosing before packaging.

 

 

 

  More Products for You to Choose

 




 

 

 

 

 2017 new fashion embroidery lace,high quality chemical lace for decoration

 

 

 

2017 new fashion embroidery lace,high quality chemical lace for decoration

 

 


 

 

 

 

 

 

Machine Working

 

 

2017 new fashion embroidery lace,high quality chemical lace for decoration